The questions Lucknow homeowners and institutions actually ask us, answered without the sales gloss.
You do. It is credited by direct bank transfer to your own account after commissioning and inspection. We file and follow up the applications, but the money never passes through us. Be wary of anyone offering to adjust the subsidy against your invoice.
A standard on-grid system shuts down during a cut, which is required by law for the safety of line workers. If your area has frequent cuts and you want backup, a hybrid system with batteries is needed. It costs more and pays back more slowly, and we will tell you so.
Roughly 100 sq ft of shadow-free roof per kW — about 300 sq ft for a 3 kW system and 400 sq ft for 4 kW. Where terrace space is tight, an elevated galvanised structure keeps the area underneath usable.
Typically a few weeks to a few months after commissioning, depending on the portal and the inspection queue. No installer controls that timeline. We track your application rather than leaving you to chase it.
For homes: Lucknow city and the zone immediately around it — Gomti Nagar, Indira Nagar, Aliganj, Vrindavan Yojna, Alambagh, Jankipuram, Chinhat, Ashiyana, Hazratganj and Sushant Golf City. For commercial projects: across Uttar Pradesh, Uttarakhand and Delhi.
We supply Tata Power Solar, Adani, Waaree and Luminous, and the make you choose moves the figure. So do the things only a survey reveals — structure height, cable run to the meter, and how much labour the roof needs. Published prices are honest starting points, not quotations.
No. We are an EPC contractor, not a shop. We design, build, commission and service complete systems. We do not sell loose components over a counter.
No. PM Surya Ghar is for residential rooftops only. A commercial or institutional plant makes its case on tariff savings, a three to four year payback, and 40% accelerated depreciation in the first year.
In four stages: 10% advance, 60% on delivery of material to your site, 20% on completion of work, and 10% after net metering is done. You never pay a large sum for work that has not happened. Bank finance is also available.
Our own technicians — the same team that installed it. We do not sub-contract installation or servicing, which is why we only take on sites we can realistically return to.
Central subsidy ends in
The PM Surya Ghar central subsidy — up to ₹1,08,000 with the UP top-up — is available for a limited period. The scheme closes 31 March 2027, or once one crore rooftops are installed nationally.